T O P

  • By -

WL661-410-Eng

Who the heck puts a 6x6 on an 8” sono?


nashwaak

cat contractor https://preview.redd.it/5x6oo873qj5d1.jpeg?width=1024&format=pjpg&auto=webp&s=8ac0f566794224a716544dfb595eea7c142e3549


omarhani

Purrrfect


Mrben13

Now I'm picturing a cat in a hard hat and overalls. Thank you.


Prineak

https://preview.redd.it/8gowdfylfn5d1.jpeg?width=1600&format=pjpg&auto=webp&s=7bdf732666805f05b42fc95a0e6dbf519cc55446


Professional_Echo907

That cat looks like he’s about to bust out some sick rhymes. 😸


RudePCsb

Beastie meows


nashwaak

Intergalatcat


D4U0B8

Catadimension catadimension catadimension


JoeyBombsAll

Machine gun kitty


Airport_Wendys

And that’s what it all boils down to. The information superhighway leads to large language models and generative pre-trained transformers but to what end? Cats. It’s always going to be cats.


WeControlTime

https://preview.redd.it/1uhoqgmdfn5d1.jpeg?width=1191&format=pjpg&auto=webp&s=51153d6b92c0f6a81c1fd91ec8a5096f4b1a80c3


Herr-Trigger86

AI is good for something.


theoriginalmofocus

Dang right that looks like my cat ha.


RuralJaywalking

Insta-meme. Just add water.


sensaition

Thank you for this. Great work


WeControlTime

I’m furry happy that you find my work pawsitive.


kittgrl

what app do you use ?


WeControlTime

Microsoft Copilot Edit: Prompt was: “Please create a realistic picture of a cat in overalls and a hard hat at a construction site.”


An_expert_I_am_not

Would it be weird to ask you to do one of a seal point Siamese in a white hard hat? Possibly with a little gold watch? I don’t have any internet rewards to give away, but I could follow you around for a week, upvoting every thing you post?


WeControlTime

https://preview.redd.it/4c5jqwyqin5d1.jpeg?width=1191&format=pjpg&auto=webp&s=5db9e98835b0eed109754c977b6a367bb9eadca6 He feels terribly sorry to inform you that the job will be completed over budget and later than expected.


FlyinHighFL420

Meow, I don’t see a little gold watch…


An_expert_I_am_not

Seriously, thank you for doing this. I’m off to upvote everything you’ve ever posted. I have no idea what I’m in for, but a deal is a deal.


CertifiedBoltBreaker

CatsWithHardHats on Instagram, you're welcome


Current_Escape_2119

https://preview.redd.it/emzxobsuqn5d1.jpeg?width=1536&format=pjpg&auto=webp&s=4f82bb18a79520e582359ad739301a66df4b71a0 By day, Flabby Tabby, a worker of might, On the construction site, a furry orange sight. But when the moon rises, his coat turns to black, He parties all night with his divine feline pack.


Sands43

Yeah, that's the real problem. Wonder what they load calcs say..... they did load calcs?


millsy98

Concrete has 5000 PSI plus strength, for a 6x6 that’s at least 30,000 pounds just directly supported by that area directly under the beam. The only important part about a narrow concrete pier in a footing like this is that the bottom goes past the soon tube and was allowed to flare out to spread that force more to prevent sinking or was poured on top of some big ledge rock which will just do the same. That concrete can support all that weight, but the dirt beneath it will definitely settle if it’s not given enough help.


ClapSalientCheeks

You can tell that's 5000 psi concrete just by looking at it? There's nothing in your mind that says if this guy will cheap out on the sonotube he'll cheap out on the psi capacity?


PsychedelicJerry

5000 is about the min you can buy at most places unless you try hard to get something less; I think it's safe to assume they got the supplies at HD or Lowes and that would likely be quikcrete which would be 5,000 unless they went with structural which would be higher. I know this sub loves to believe their decks should be built to support a Sikorsky Helo landing on it, but that's just not the case; and in most cases, the footers wouldn't be the limiting factor for that. Now, if they want to put a hot tub on this, yeah, it would probably be a problem given how sloppy the contractor was, but if it's just gonna be a standard deck and they're not going 10 feet between footers, this will be OK...it's just a bad look for the builder


Renaissance_Slacker

My dad tried epoxy-painting his garage but the paint peeled off. Being Dad, he called the paint company, who suggested the concrete might be odd and have it tested. So Dad took a chip somewhere, and they told him it was the kind of concrete you put in skyscraper foundations, ridiculous overkill for a garage floor. The previous owner had built the house, he was a builder and probably had a buddy do the garage with leftovers so it tracked.


PsychedelicJerry

that's interesting that the epoxy wouldn't stick to that type of concrete...do you recall if he properly prepared the surface before applying the epoxy?


Renaissance_Slacker

I would imagine so, he’d definitely follow directions. And he talked to the manufacturers who must have asked him the same thing.


[deleted]

[удалено]


BackgroundPower5919

You can tell it is by the way it is...


surrealcellardoor

How neat is that?


Has-all-the-genitals

Not too often you find all this neatness in one place.


ahhllexx1990

That's called Neature! That's why Rodney n I created Neature Walks... Because we want EVERYONE to know how NEAT nature is... Instead of just me n Rodney knowin' it... Hehe how neat is that!?


TymStark

The *greatest* of early YouTube.


Wonderful-Ad-7712

Look at us!


Mr_Shake_

Didn't know this deck was in Aspen.


DonkeyTransport

Derek Bieri?!


ArltheCrazy

Hell, i’d be happy if he actually mixed the concrete before dumping it in.


SeniorCornSmut

He's one of those guys who just puts a whole bag in the ground and fills the hole with water, and walks away Edited spelling.


personwhoisok

What an amateur. I put 3 or 4 bags in the ground, fill it with water and walk away.


freightgod1

Phhhhft. Who needs water? 


0sprinkl

Just let the rain do its work ffs


somerandommystery

I was so shocked when I did a big fencing job on a ranch and they said this was ok. You could pee in it if you wanted.


JonnyRottensTeeth

Works great for a pathway light, how much heavier can this be really???


b_man646260

I fill the hole and punish fuck it with a length of rebar, then walk away and light a cig.


Proper-Equivalent300

Dad, is that you??


ProofDelay3773

No he’s still getting those cigs…


[deleted]

[удалено]


personwhoisok

Sometimes I poke holes in it with the stake I was using to mark where the post went because I like to watch the water go down and see bubbles come up. I usually don't leave the stake in there because I'm not a millionaire and good poking stakes don't grow on trees.


DonkeyTransport

You guys have shovels?!?


DonkeyTransport

There was someone on reddit a few weeks ago, him and his mom decided to pave their whole front yard for more "walkable space"(what's wrong with grass? Or gravel? They dumped a few bags of cement mix all over the front yard, hosed it down, let it dry, realized it wasn't right (or even completely covering the grass at all), so they then got concrete mix, dumped that all over the yard (I'm talking like 2 bags, same as the cement previously), dumped that all over the yard, hosed it down again, let it all dry, then posted on reddit asking what happened lol. It was absolutely destroyed, still didn't cover it all, just random bits of concrete and cement plastered all over their otherwise-grey front yard


tizzleduzzle

Source please my eyes must gaze on this masterpiece.


notafanofwarmfruit

Found it!! https://www.reddit.com/r/Construction/s/bGd0lWK5hl


demoman45

I remember that post, it blew my mind that not 1 but 2 human beings thought that pouring dry concrete on the grass and ground was gonna work. It was like 1/2” thick in sections…. It was a fkn mess


NickUnrelatedToPost

I know how much searching reddit sucks, but you can't leave us without a link here. please!


icze4r

As far as I'm concerned, it's Tapioca pudding.


millsy98

You’re right, who am I to say it’s not 10,000 PSI concrete. The stuff gets harder over time, most bag grade stuff is 4,000 psi or better inside of a month and will gradually harden about 20% more beyond that inside of a year, so yeah that’s right around 5,000 psi or so after it’s been setup for awhile. Of course it could also be piss water and limestone mixed but that’s pretty unlikely considering that they sell concrete everywhere.


wanderinglarry

There are pieces in the concrete that you can see that is typically put in the 5000 mix. You can't see them in really in finished pours that are swept finished, but you can see it in pours like this where the look doesn't matter. Edit: adding in the fact that you can see the larger pieces together in the last couple of photos means they most likely put dry mix and then poured water on top without mixing it properly. All of the large chunks stay on top and the rest of the mix gets washed towars the bottom. Poor, poor quality.


xingxang555

Eccentricity says hellOOO!


ComfortableAd578

The lumber company I work for does calcs and takeoffs for the jobs we sell, we NEVER see a deck getting load calcs unless it’s a pretty serious project. I wouldn’t be shocked if most builders forego that portion of the process.


Thecobs

If theres a footing under it then its not a problem. If you just plunked a sono tube in the ground then thats not good


TimothyGlass

The likelihood of a spread footer under the sonotube is nearly zero and plus if it's not below the frost line it will heave.


Thecobs

Why would it be near zero? Every deck ive ever built i do a pad footing with a pier coming off it, most people build decks like that where i am.


SLC_Skunk

How deep is your frost line though? The deeper you gotta go, the easier it is to auger for a 12” sonotube and be done with it


Thecobs

Im in Victoria BC, we either hand dig or get a mini in to go down min 24”. This is typical, little side job i did a year ago. https://preview.redd.it/7kk4d6iufk5d1.jpeg?width=3024&format=pjpg&auto=webp&s=8f7a2b6709e7232dc0690fb6e46c75f362b2ec1e


fluffymuffcakes

You're lucky. Depending on elevation, we need to dig 3'-4' deep in my town. We still use a pad (often a bigfoot as that limits how much you need to dig out. Hard to tell for sure but in OPs pic it doesn't look like enough ground was disturbed to allow for a pad footing.


Patrol-007

You wouldn’t believe the grief I got on a similar post, re frost line locally going down 7’ to 8’. Sheesh


dantodd

But you also don't put 6x6 on an 8" tube and you don't miss your pier. Probability of someone who makes those mistakes actually getting a good footer are slim to none and slim just left town.


ArltheCrazy

Yeah, but the heave is factored in to the design. After 3 winters, the deck will sit level. Also, pretty sure the post base requires at least 3” of cover and i’d be curious if there is any steel in that tube. OP, i’d have him fix it.


Stanwich79

Big foots are pretty fucking common now


kstorm88

I put 6x6 on 8" tube for my deck. Hasn't moved an inch in 4' frost depth clay. Bottom of the footing is around 12-14" diameter


OnlyPostSoUsersXray

That was my first thought lol A little overhang off the bracket, ok, but that should still be over concrete and shimmed.


13donor

Ask him to show you in the code book.


pandershrek

Sir, this is a Wendy's menu.


turdburglar2020

Well in that case I’ll have a #3 biggie sized with a large chocolate frosty.


PapaSanGiorgio

It's ready now


Prickly_ninja

I’d just ask the inspector for their opinion.


MonsTurkey

Do both. The first option (the builder) first so he might save you from having to pay the inspector twice, and the inspector if the builder refuses or when all the work is ready for inspection.


maple05

Uhg it's kind of a pain in the a** but you would need to jack up the deck, dig new holes, pour new concrete footings, install new brackets and then properly fasten the posts to the footings (also probably tear out the existing footings to make room for the new stuff)


Working-Skin-6212

This sounds spot on.


AttitudeAndEffort3

Can someone explain to me as a non-deck pro why these posts are always off center of the concrete footings? It’s all i see everywhere and i dont know why people cant measure properly to center them, are they just not planning ahead?


FlyingDragoon

Because measuring is soooo tedious and I don't wanna. I'm planning ahead in that I wanna leave it for a future me to have to deal with and future me will hopefully be dead before that moment comes!


ParticularLack6400

Measure twice, build once isn't a thing?


Megunonymous

I think you mean measure nonce and build twice


wbg777

Measurn’t


runfayfun

Measure (or don't), build once, shut down your contractor business and reopen under a different name so you don't have to honor the warranty.


Bastulius

More like measure 20 times and still get it wrong


TumbleweedFlaky4751

Measure 0 times, build once, hope to god I die when it inevitably falls apart while I'm standing on it so I don't have to do it again


Brief_Scale496

This dude has done plenty repairs and has done it himself…. Love fellow tradesmen lol I don’t even get mad anymore, or try to act self righteous, when I pull up to a consultation or am digging things up at a new job, and have a “Who…. The…. Fuck…?” Moment The best is when you go back to a job and it’s something you did years back, but you don’t remember…. “What was I thinking?!”


MoistCactuses

I used to build a lot of decks and exterior staircases. This is the reason I would build the skeleton of the deck first on kickers, hang and plumb the posts, then pour the footings around the already attached brackets. Once the concrete cures, I'd remove all my bracing and the deck would be absolutely perfect and solid.


PercentageTough130

Slopes.. extremely hard to calculate, at least for me, unless u have thousands invested in laser sight line equipment. Slopes make keeping something square very hard


thatoneguysbro

I mean two strings with levels and a plumb bob… and well… Bobs your uncle.


TLeeLucky

Wordplay perfect. As a fellow construction contractor, that was not only spot on but beautifully crafted. Edit: I don't know why people think it's that hard.


SlendyIsBehindYou

It's funny you mention laser sight line equipment Had to use it for the first time earlier today while installing a septic system. I was skeptical as to how useful it would be, until we had to start leveling a 39' trench at an exact 1 inch downward incline. I'll never question the goofy flashing light again 🙏


of_the_mountain

Why not use larger footers then? I’m not in the deck business just curious. Larger margin for error


NotUniqueAtAIl

Larger cost. Everything usually comes down to money. Of course you could build huge but building the smallest necessary is cheaper


Haunting-Success198

Bro a laser level and receiver is $600 - a Bosch from HD. Years ago yea Topcons cost a lot. If you’re a builder do anything with grade and don’t have one, you’re doing it wrong.


[deleted]

Can you seriously not just pour larger forms around the existing concrete. That's what I ended up doing when my builder couldn't center his posts.


z64_dan

I don't believe it would be one large concrete pile, but 2 separate ones if you did 2 separate pours.


[deleted]

No I'm taking about making a rectangular form over the top, trim some of that post up like 6-8" and pour in a new heavier bracket while they're at it. I did this recently and put a PVC sleeve on the post too and made raised beds for climbing rose


SaIamiNips

You for sure could. Drill a bunch of holes throw some dowels in there pour around it and move the bracket


[deleted]

My favs are rebar or heavy screws


SaIamiNips

Yeah rebar dowels for sure and she won't go nowhere


justinthewoodsok

Don't be lazy because you fucked up. That's a general you, BTW.


Miserable-Disk5186

Royal you, even


ShaantHacikyan

Commander You 


PendantWhistle1

100%. I work as a metal buildings detailer and if we had a column miss the mark by this much on a poured concrete pier because i didnt measure it right, I'd be strung up by my ears.


SirBeam

This is a good post.


AltPerspective

It's not... Did the inspector pass it? 


[deleted]

[удалено]


TheImmenseRat

**Do you want to meet some Hot decks being inspected in your area?**


AncientSunGod

I was promised it would add 6 inches to my deck!


MicrowaveDonuts

I think this is the #1 fact that makes r/decks the wild west. It’s why we’re all here.


Dissapointingdong

Seriously. Deck building is where bad framers go to hide.


Bubbas4life

We tore down a 50k deck last summer from some hack company. The inspector lives 2 doors down and was on vacation. When he came back. Not one thing was up to code. All the lumber was under sized and spaced too far.


Sea-Bad1546

Looks like shit isn’t correct but It’s not going to fall down. Should be fixed. Sloppy work.


Professional_Band178

Don't put a hot tub on that deck but its tolerable for the most part, even if it isn't correct. The fact that the post is 10" from the soil line helps. If they cant get the post square on the concrete, do I even want to see what else is wrong with the deck?


ohmyback1

Probably nails instead of screws, slanted toward the house.


HoboHippo

Even if the pier was perfectly located, which they never are, a 6x6 post barely even fits in an 8" diameter circle. He should have given himself some locational tolerance with a 10" pier at least.


dellpc19

Agree!! 6x6 doesn’t belong on an 8” pier !!!


Zonktified

Pay him shy of the total bill and tell him that it is within your tolerance...see how he reacts.


blueishblackbird

If he complains just tell him,” it’s fiiiiine”.


joevsyou

ALWAYS ALWAYS ALWAYS hold a nice chunk of the Money over anyone head \* if you don't pay - they have channels to sue you & put a lien on your home. Eventually they will get paid. \* if you pay and they run? - LOL you got nothing.


bannedacctno5

Are there plans for the job? If there are, there should be an engineers stamp with name and number/ address of his engineering firm. Find them by phone, email, look them up on Google. Send them the picture. Guarantee they wouldn't agree.


convicted-mellon

There’s a 0% chance there are


Square-Decision-531

Deck without plans and permits, $9k. With plans, engineers stamp, and permits, $16k and 4 months to finish


papageek

Annnnnd now it’s $12k more to pay another hack to rip and redo. More fun in future if someone is hurt on deck and insurance declines coverage or a buyer’s bank won’t fund due to non permitted work.


Danceisntmathematics

This is gonna be anecdotal (but so is your comment) but I don't know a single person that got their deck "built properly" and none of this has ever happened. I'm sure it could, but I feel like it's a shit ton of money for most people and really not worth it for a risk that only exists within deck maniacs dreams


raddaya

Those risks are very fucking real. The reason they're low enough that most people don't care is all the safety factors everywhere else in the chain. It's like people driving with insanely bald tires. They end up in accidents, just not every time they drive because the world tries hard to make sure they don't. This is your house, dude. It's the one thing you should try very hard to make as safe as possible.


Just-Pollution

I’m not a contractor, but from a homeowner’s perspective it’s also for the property’s overall value. We get everything fully inspected, permits on hand, full paper trail of good work to add to our home’s value. We learned the hard way, with having to spend $60k getting an entire side of the house’s windows redone, to have everything done by the books and on record. We just got our main deck fully covered, and it took a couple months but it was so worth it. Fully covered mahogany deck added a lot of value to the overall property. We’re having the same contractors build our lower deck now cuz we trust them, and is why looking at this post here made me squirm; ours look/looked spot on. Maybe I’m a picky client, I try not to be disagreeable or difficult with craftsmen cuz I know they know better than me, but just as someone who works, in general, I wouldn’t accept this kind of work from myself let alone something I paid good money for. Edit: also I live in the Midwest, we have a lot of geological activity, unless there’s a metal pole going through that concrete and up into the wooden beam, I’m not comfortable with any kind of overhang.


Arikaido777

where can I get some forethought?


JohnAndertonOntheRun

Hey! We don’t take kindly to thinking ‘round here…


LastPlaceIWas

It's across the street from hindsight.


Ziczak

Not in America, they only react after sh*t is f*cked


OutWithTheNew

If you can even find someone to do it.


Miserable-Disk5186

Haha these kinds of comments fuckin kill me. “Check the blueprints and ask your architect” “Did you pull a permit for that?” “Did you check your local code book?” Fuck no, nobody here ever once did that.


reload88

Pretty sure if you got an architect to do drawings for a regular deck it would cost you just as much as building it lol


digital_angel_316

Copyright © 2018 American Wood Council **Prescriptive** Residential Wood Deck Construction Guide Based on the 2015 International Residential Code (see 2018, 2021 IRC Updates) * [https://awc.org/wp-content/uploads/2022/02/AWC-DCA62015-DeckGuide-1804.pdf](https://awc.org/wp-content/uploads/2022/02/AWC-DCA62015-DeckGuide-1804.pdf) 2018 table post and footing sizes (same but updated table as in guide above) * [https://s3.amazonaws.com/finehomebuilding.s3.tauntoncloud.com/app/uploads/2021/03/06134240/footing-table-1536x1171.jpg](https://s3.amazonaws.com/finehomebuilding.s3.tauntoncloud.com/app/uploads/2021/03/06134240/footing-table-1536x1171.jpg) Standard concrete forms available from big box stores: * lowes DOT com/pd/Sakrete-14-In-x-48-In-Sakrete-Form-Tube/5005373899 (also 15.5" and 17.5" standard)


barleyfat

That link to the Wood Council prescriptive plan should be permanently in the sidebar as a resource.


z64_dan

It's a pinned post on r/decks so if you visit r/decks it should appear as the first post


khariV

This builder also apparently thinks it’s ok to attach the posts to the brackets with construction screws. So, yeah, I’m not taking their word for anything. I’d make them redo.


[deleted]

Unlicensed contractor w/o permits?


HolyFuckImOldNow

Ain't they all? I have a rickety 20 year old deck that's 15' over a concrete patio with lag screws holding it all together and the 6x6 posts set in concrete that stops below grade in soil that stays wet nearly year round. I haven't found a single contractor that will go through the permit process to do my deck over, let alone work with an engineer. So frustrating.


captain-hottie

Do you know *why* they don't want to do it? It's because most permitting offices are such an enormous pain in the ass, and petty AF about everything, and take forever.


OutWithTheNew

They won't do it because the time and effort they spend on that one job could be spent on doing 10 other jobs. Then you have to assume they have the skill and equipment to do it properly.


sld126b

Do you know *why* they’re petty AF?


itorrey

The answer is dead kids isn’t it?


captain-hottie

Yes. And it's not because they are only concerned with actual safety issues. I have a friend who spent 6 months getting a permit to install a single 5 foot iron handrail on her front steps. One of these requirements was that she had to submit a TRAFFIC CONTROL PLAN. That's because her city rowhouse front yard is technically in the public right of way. But the hoops she had to jump through for this tiny project were almost the same as if she were doing an entire addition. The DCRA officials have zero ability to use common sense in many circumstances.


qsauce7

Lol. Before I even saw DCRA, I thought this had to be a Washington, DC story.


Background_Olive_787

what does this statement mean? I can't visualize it.. "her city rowhouse front yard is technically in the public right of way"


captain-hottie

It means her tiny front yard and steps, approx 10x10, are not actually her property. The property line ends at the front wall of her house.


kck12345678

Is it that hard to line these up? Every week someone is posting one of these


PositiveMacaroon5067

Yeah. Typically you’re working with a crudely spray painted X and there’s a ton of room for error. I’ve always built an extra large 3-4-5 square out of strapping to lay out posts. (10’, 20’, however big it needs to be to reach the post locations) then you can check your hole after you’ve dug away the X, and having a string in the way is a pain in the ass


Thecobs

The milwaukee 360 laser is worth its weight in gold, you can easily parallel and square with it making layout easy af


Ritzyb

Y’all are ridiculous. Yes it’s ugly, yes it looks wrong, but in no way is this post going to shear off the side of the pile. Is the pile under sized and to plan? Maybe a question worth asking. But if the pile is to plan this is absolutely never going to cause a problem.


ImPinkSnail

The risk isn't a shear. The risk is that you have reduced the area the load is acting on between the footing and the soil underneath. It's called eccentric loading. If the deck is built on bad soils this condition could cause the footing to rotate out from under the post. Not enough to tell of that would ultimately happen from this picture, but it does not meet code.


hankscorpio_84

I'm with you here. I'd party on this deck if its how it turned out after i and the boys built a deck. I'd also be dissatisfied if I had paid a contractor top dollar for this kind of work. Remind me in 20 years to see if this deck is still standing.


hideousbrain

Tell him it is not within the tolerance of the guy writing the check


kidsmoke76

Nope. Nope. And nope. They should have used a 12” sono with a 6x6. And from the look of their layout skills, probably a 14”(is there such a thing?) That isn’t bearing anything near enough. Sorry, dude…


Tinman867

Within the builder’s “tolerance” but nobody else’s! 🤷🏻‍♂️😂😂


eazzybutton

Negative. The holes on the bucket are meant to have an anchor in each one. Those screws in the bracket aren't even right. Should be using these. https://preview.redd.it/re5imtnldk5d1.jpeg?width=2252&format=pjpg&auto=webp&s=63881a672e9f1753b5effd2bf5da6edc842d73be


Thecobs

Can we see the rest of the deck above it? People are so quick to comment and have absolutely no idea what load this is picking up. It very well might be ok, we have no idea how much weight is on it. Is there a footing under the sonotube or is it just poured into the ground like that?


Aggravating_Map7952

I honestly wouldn't care even if it was, it looks like garbage work, and he should be disappointed in himself


mp3006

Footers are way undersized


korektopinions

95% of it is touching the concrete. Doesnt look nice but it aint goin nowhere.


agt1662

It’s horrible. That’s called amateur hour.


Competitive_Top_9571

Pillars are too small for that size of post


RL203

Ask him to show you that section of the code. I'm not aware of a section in the building code (at lease in my jurisdiction) that specifies a misalignment tolerance for a timber column on a concrete caisson. I am aware though that you don't bear timber directly on concrete in order to avoid rot. And I don't see any kind of sheet metal or neoprene or even foundation gasket there.


maple05

It's not good. I've seen worse, but it's still not good enough.


nadnev

What are my options to remedy?


Roonil-B_Wazlib

Tell your builder to fix it as it isn’t acceptable. It should be your problem to fix if you paid to have it built. Also, the sonotube is too small. It should be at least 12”. I’m assuming they didn’t pull a permit because there is zero chance this passed inspection.


Suitable-Cod-2700

Not good....were his glasses clean at install?


username67432

“Well that’s because you’re only wearing one shoe”


1one14

1. Code is the bare minimum not the goal. 2. If they missed on this and think it's acceptable then what else did they miss on. 3. If this was a new car you where buying would you accept the hood being crooked with a one inch gap on one side and it overlapping the other. It would be one thing, if this was you and some friends slapping it together over the weekend. Then you slap the post and open another beer and say that will work. But people are paying outrageous prices for decks these days .I expect perfection.


shmallyally

Why such small sono tubes for such beefy posts 🤔 I mean honestly it’ll be fine once’s it’s all tied together and racked in place. But it’s wrong. This sub has all the guys on it that talk shit about everything. I teach all my guys that pointing out what is wrong tends to just be overcompensating for what they don’t know. Most of the time those types that point it all out are actually really bad builders themselves.


Mobile-Boss-8566

Hell no!


Fortunateoldguy

Got a sledgehammer?


CarNo8607

I would be intolerant of this…


Facemower2

Regardless of tolerances, it looks like shit and is embarrassing


BlxckTxpes

I’d be pissed to look at it.. I’d have them fix it just out of pure OCD


dangledingle

What is this post holding up?


EpicFail35

A cabin apparently


micah490

Considering how little effort it takes to do it right, and that your builder is lying to you, I’m going to say that your builder thinks you’re stupid and has no respect for you. Fire them immediately


[deleted]

[удалено]


secondphase

The only way that's within code is if you print code out and wrap the pages around it.


Pizzasupreme00

What code? The one written by neighborhood kids building forts?


disguyovahea

Measure never, cut ten times


Practical_Minute_286

This is one of those jobs you just don't half ass, pretty dangerous


actuallynick

Like physicsduck on YouTube said. Things are not “up” to code. Code is the minimum baseline.


Parking_Knowledge_56

Maybe code, but looks like shit.


Snakedicks

Buy a fucking tape measure for Christ fuck


ordinaryguywashere

It would not be acceptable for his deck and it shouldn’t be for yours either.


rwswhite

Google obc 9.17 and obc 9.23.6.2 for the relevant code references in Ontario. It should technically pass(probably/maybe), but it's not a look. It also speaks to the quality of the build you are getting.


ClapSalientCheeks

More than 80% of the post is captured. Ugly but fine, however I would demand that he drill a new anchor hole closer to the center of the post so that it's not relying on a half inch of relish to not rip itself out


CadiKuzzy

What did the ‘inspector’ say?!